中文字幕av线,色必久久,日韩精品中文字幕在线播放,中文字幕日韩视频,中文字幕av88,国产老女人高潮大全,偷拍久久网

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Industry News

Cathodic protection of deep well anode impressed current for long distance steel oil pipeline

  • Author:Libo
  • Source:wm.wanka5151.com
  • Date:2021-06-11
  • Click:0

Deep well anode system is a forced current cathodic protection installation. In this system, anodes are arranged in specialized or existing boreholes that extend vertically down from the earth's surface, completely or partially at an electrical remote location.


Deep well anodes can provide effective cathodic protection for underground pipelines, storage tanks, oil refineries, power plants, sewage treatment plants, steel pile structures and oil well casing, etc. It is suitable for areas where the surface soil resistivity is very high, or where the soil layer is shallow and there are high resistivity soil conditions below, despite the relatively low resistivity.


However, the strata protruded must have sufficiently low resistivity to be suitable for the installation of deep well anodes. The deep well anode can emit a certain amount of current when the appropriate voltage is applied. Installing anodes in deep strata with low resistivity results in a very uniform current distribution along the structure compared to topsoil. Even if the surface soil is perfectly suitable for shallow buried anodes, deep well anodes are more suitable for densely constructed areas. Because shallow buried anodes are difficult to place, they must be placed far away from the protected pipeline and other structures.


The maximum anode current can be uniformly discharged by installing multiple anodes in a carbon packed column. The highly dense carbon filler in the anode bed of deep well can discharge the maximum current from the anode surface, thus increasing the life of the anode. Because of the high probability of encountering groundwater, it is possible to obtain minimum loop resistance. A properly installed ventilation system minimizes the risk of air resistance and facilitates wetting of the anode bed with potable water. The low loop resistance of this anode system minimizes power consumption costs. In areas with external underground structures, a maximum output current of 30A for deep well anodes is recommended.


Design considerations:


1. Soil resistivity:


Deep soil resistivity can be determined in several ways. Soil resistivity can be measured by the quadrupole method. When the quadrupole method is used to measure soil resistivity at deep depths, the electrodes inserted into the soil cover a large area. This requires a large open area. In order to obtain accurate measurement results, the measuring electrode must be placed in a place free from any underground structures. These underground structures can absorb or expel some of the test current and can mess up the geometry of the measured power plant. It is often impractical to use the quadrupole method to measure soil resistivity at sufficient depth in urban areas.


2, the size of the anode well:


An average deep well has an anode depth of 50-500 m. The final depth of the anode well is determined by the main formation structure near the designed well location. Deeper anode systems provide better remote results and greater protection range, and can be installed with more anodes to increase system life.


3. Exhaust pipe:


All deep well anodic systems shall take measures to discharge anodic gases to the atmosphere. Lack of exhaust measures can lead to anodic resistance and ultimately system failure. Air ducts are usually fitted for venting. The exhaust pipe has air holes where it passes through the active section of the deep well anode and is non-porous where it passes through the inactive section.


4, anode suspension system:


The standard installation method is to place each anode downhole using a cable attached to the anode, hang it at an appropriate depth, and strap it in place at the surface. This method allows the anodes to be positioned in a low resistivity soil layer.


Some deep well beds use rope, steel pipe or exhaust pipe as an open supporting system to fix the anode to eliminate the stress on the anode cable.


Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881

莒南县| 双桥区| 龙州县| 湖北省| 曲阳县| 赣州市| 黄冈市| 东丽区| 济南市| 明溪县| 揭阳市| 昌图县| 扎鲁特旗| 徐汇区| 平塘县| 兰考县| 扎赉特旗| 杭锦旗| 保德县| 邛崃市| 青田县| 株洲市| 麻栗坡县| 星子县| 临泉县| 巴林右旗| 奉新县| 神农架林区| 徐州市| 收藏| 龙海市| 元江| 民勤县| 会泽县| 连州市| 永济市| 沙洋县| 读书| 庄浪县| 昭觉县| 屯门区|